benameji

 

FACT OF INTEREST

INITIAL OBSERVATION: The Project, initially one (Section: Maçanet - Riudellots), was subsequently divided into two subsections, called: MAÇANET - SILS and SILS - RIUDELLOTS.

YEAR: 2003

 

SPECIFICATIONS:

 

LENGTH:

5,66 kms.

 

KIND OF WORK:

Double track of UIC wide High-Speed Rail Roadway

 

(Roadway total wide, 14,00 m).

 

Maximum speed: 350 km/h

 

Traffic type: Mixed (Passengers and goods)

 

STRUCTURES: 

2 Underpasses and 3 Overpasses.

 

3 Viaducts:

 

« Sequía de Sils. viaduct »: 223 m long, 5 spans, 55 m maximum span and 3.122,0 m² area.

 

«GI-555 highway viaduct »: 178 m long, 7 spans, 30 m maximum span and 2.492,0 m² area.

 

«Riu d´Esplet »: 99 m long, 3 spans, 41 m maximum span and 1.386,0 m² area.

 

CONTRACT BUDGET (Includes both subsections): 1.139.173,30 € (VAT included)

 

ESTIMATED BUDGET TO INVITED TENDERS OF THE WORKS: 36.474.820,37 € (VAT included)

 

PERIOD PROVIDED FOR CONSTRUCTION: 20 months.

 


CLIENT: SPANISH MINISTRY OF PUBLIC WORKS. Railroads Administration.